Investor’s Guide
 
Investment Advantage
Investment Procedure
Q&A
 
 
Investment Enviroment
 
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
·Geography Advantages
·The safe political environment
·The opened economic system
·Low labor cost
·The favorable trade status
 
 
 
 
Q&A
Location:Home>>Investor’s Guide>>Q&A
 
Q:Road service

Q:Rohitha

Q:Waste clean wood

Q:Power supply

Q:Utility Costs

Q:What are the conditions and planning of power generation in SSEZ currently?
A:

In Cambodia, the electricity is mainly generated by heavy oils. Because the Sihanouk Province is treated as another new economic center in Cambodia in following few years, the two Cambodian thermal power generation projects are allocated in Sihanouk Province, of which the power station (2*50MW) invested by a Malaysian company has been put into operation in 2013. In July 2013, the SSEZ Company transferred the electricity supply which is generated by the diesel-generator belonging to the SSEZ Company to electricity supplied by the Cambodian Electricity du Company (EDC) with a lower electricity price. Moreover, the self-built generator sets (4*1000KW) are set as reserve power supply when power failures happen.


??1 2 3 4 ??

 
 
 
 
 

Sihanoukville Special Economic Zone
Add:No.4 National Road212km,PreybNob District,Sihanoukville,Cambodia
Hotline:855-71-8608066

 Email:consult@ssez.com

蘇ICP備12065480號-1
免费观看一级特黄欧美大片,天天影视涩香欲综合网迷情校园,美女午夜写真伦在线视频,99red在线观看精品,日日噜噜夜夜爽爽狠狠视频,先锋7xfplay色资源网网